The Monon South Trail’s New Pekin trailhead, at East Mill and East Railroad streets behind Pekin Town Hall, with parking in the trailhead lot: a shelter, restrooms, water fountains, bike racks, benches and a trailhead monument sign (Radius Indiana). New Pekin’s segment — 1.39 miles of asphalt and 3.9 miles of crushed stone — is part of the 10.5-mile run south toward Deam Lake that opened in June 2025 (Indiana DNR). Note: the trail operator’s own trailhead page still labels New Pekin ‘(Under Construction)’; the DNR opening and current trail reviews say it is open, so the label reads as stale page copy — flagged here rather than silently dropped. Free.
Own this place, or spotted something out of date? Request a change or removal.
Parent intel
- Cost
- Free
- Setting
- Outdoor
- Age fit
- Toddlers (0–2),Preschool (3–5),Kids (6–9),Tweens (10–12),Teens (13+)
- Stroller friendly
- Yes
- Bathrooms
- Yes
- Last verified
- Nov 13, 2026
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.




